Claude Certified Associate · Foundations

Module 7 · Fix weak results fast

Study notes written by Sanjay Shah. Not official Anthropic material. Facts marked "check before relying on it" may have changed.

Practice this module

On this page

Claude study notes · Claude at Work · Exam domain (guide v1.0): Troubleshooting and Optimization (10%) · Our own notes, written for this course.

Use with: checklist AF-C7 · Five-step fix sequence · exercise AF-E7 · Diagnose three failing outputs · video script · test set and change log · practice questions

All schools, companies, invoices and customers here are fictional sample data.


What you'll be able to do

  • Diagnose a weak output with five steps: Gap → Input → Instruction → Setup → One change.

  • Find the real cause instead of giving up or rewording at random.

  • Give feedback that steers: what's wrong, what good looks like, one example, what must not change.

  • Catch silently missing rows in tables and lists with a row-count check.

  • Make a recurring task faster and more reliable with a saved fix, a small test set and a change log.


Key ideas

1. Two bad habits

When Claude gets something wrong, most people do one of two things:

  1. Give up. "AI is useless", and back to doing it by hand.

  2. Reword at random. Try again, say it differently, add "please", until one answer looks right.

The trouble with the second habit is that when it finally works, you don't know why. Next week it breaks again and you're back to guessing. The better way is to treat a weak answer like a fault and find the cause.

2. The five-step fix sequence

#StepAsk yourselfCommon causes
1GapWhat exactly is wrong, in one line? What is right and must stay?If you can't write it in one line, look again before touching anything.
2InputWhat did Claude actually receive? Read your request and files as if you were Claude.A detail never given · relative words like "next Friday" · a paste that was cut off · the wrong file
3InstructionDid anything say what to do in this case?No reader or tone named · no format · no "if it's missing, ask me" · a vague rule ("be concise") · a rule buried in a long block
4SetupRight place, right files, right model, right size of job?Asked outside the Project that holds the file · an old or duplicate file · a very long chat · a job too big for one answer
5One changeChange one thing, re-run in a fresh chat, compare side by side.Change the cause you found, not everything at once.

Most fixes are at step 2 or step 3. The input was thin, or the instruction didn't cover the case. Switching models is rarely the fix, which is why setup comes after input and instruction, not first.

Why "one change"? If you change the request, the instructions and the model all at once and it works, you've learned nothing about the cause. You won't know which change to keep, and you can't fix it the same way next time.

Why a fresh chat? A re-run in the same chat still carries the old, wrong answer and everything before it. A fresh chat (inside the same Project, if you use one) gives a clean comparison.

3. Step 1 in practice: name the gap

"It's wrong" gets a vague fix. "The date is wrong; the subject, chapters and calculator note are right" tells you exactly where to look, and what must not change when you fix it. Write the gap down in one line before you change anything.

4. Steps 2 and 3: input versus instruction

Ask in this order:

  • Was the fact in the input at all? If the date was never given, Claude didn't misread it. It filled a gap you left. The fix is to give the fact.

  • Did an instruction cover this case? If nothing said "if a date is missing or vague, ask me", Claude did the helpful thing, and the helpful thing was a guess. The fix that stops it happening again is the instruction.

Often you do both, in two rounds: first fix this output (give the date), then stop the next one (add the rule), each time changing one thing and re-testing.

5. Step 4: setup problems

Setup causes are less common but easy to miss:

  • Wrong place. Asked in a plain chat, when the file lives in the Project.

  • Wrong or stale file. Last year's calendar, a duplicate template, or a different policy attached by mistake. A wrong file can produce confident answers dressed up with clause numbers from general memory.

  • Too long a chat. Rules from the top get crowded out (Module 1). Ask for a summary, start fresh, paste it in.

  • Too big a job. A very long table is a very long reply, and long replies can be cut short or quietly summarised. Split the job and ask for a count.

  • Model. Only after the others. If the task is hard reasoning and everything else is right, try a deeper model; if a fast model ties, keep it.

6. Feedback that steers

"That's wrong, try again" is the weakest thing you can type. Instead give four things:

  1. What's wrong: "Too stiff for a regular customer."

  2. What good looks like: "Warmer and shorter."

  3. One example: one line in the tone or format you want.

  4. What must not change: "Keep both delivery dates exactly."

The last point matters: when Claude rewrites for tone, facts can move (Module 3). Say what is fixed, and re-check it.

7. The row-count check

For any table or list made from a file, ask: "How many rows are in the file, and how many are in your table?" If the numbers differ, split the job into parts, and ask for the row count and a subtotal for each part. Then check that the subtotals add up to the total you compute in your own spreadsheet. A table that looks complete is not the same as one that is.

8. Make a recurring task faster

If you fix the same mistake every week, the fix is in the wrong place. Four habits:

HabitHow
Save the fixPut the working rule in the Project instructions or saved prompt, not in your head.
Keep five test casesReal requests, each with a "pass if". Include every request that has failed before. Keep the sheet next to the Project, not as a knowledge file, or Claude could read the answers and it stops being a test.
Re-test every changeRun all five in fresh chats after each change. A fix for dates can quietly break something else.
Keep a change logVersion · date · what changed · why · test results.

Next month, when an output looks different, you won't wonder why. You'll read the log.


Worked examples

These match the Module 7 video and the files in associate-m7/assets/.

Example 1 · The wrong exam date (Input, then Instruction)

Demo Secondary School has a Project for notices to parents. The office pastes a message from the science teacher: "Class 8 science unit test is next Friday. Chapters 4 and 5. Bring a calculator." Claude writes a clean notice, with a date. The teacher meant Friday 15 January 2027, and the notice says a different Friday.

  1. Gap: the date is wrong; subject, chapters and calculator are right.

  2. Input: the request says only "next Friday". No date anywhere. Claude can't know which week the teacher meant.

  3. Instruction: the Project says "always check dates against the calendar" and "never invent a fee, a time, a rule or a reason". Not a date. Nothing says "if the date is unclear, ask me".

  4. Setup: right Project, this year's calendar uploaded, fresh chat, usual model. Unit tests aren't in the calendar, so the date wasn't there to find. Setup is fine.

  5. One change (round 1): put the real date in the request. Re-run: right date, same chapters, same calculator.

Round 2, to stop it happening again: add a section to the instructions, "If a date is missing, or given only as words like 'next Friday', don't work it out. Ask me." Update the version line to v1.1. Re-run the original "next Friday" request: Claude now asks for the exact date.

Example 2 · The invoice table with missing rows (Setup)

Demo Traders' October invoice register has 120 invoices (DT-INV-2001 to 2120). Asked for a table of every invoice with the total, Claude returns a table that looks complete. The row-count question shows 120 in the file and fewer in the table.

Input: fine. Instruction: fine. Setup: the job is too big for one answer. One change: split the file into three parts of 40 and ask for the row count and subtotal each time. Forty, forty, forty, and the three subtotals add up to the spreadsheet total of NPR 40,45,050.

Example 3 · The stiff customer reply (Instruction, fixed with feedback)

A customer in Pokhara asks whether Demo Traders can deliver on a Saturday. It can't, but it offers two other days. Claude's reply is correct and "as warm as a tax notice". Gap: tone. Input and setup: fine. Instruction: nothing said how the company talks to regular customers. One change: feedback with an example: "Warmer and shorter, like this: … Keep both options and dates exactly as they are." The new reply is friendlier, and both delivery days are still right.

Example 4 · Three diagnoses from exercise AF-E7

CaseWhat went wrongFailed atOne fix
Meeting summary says "no formal decisions"The paste stopped mid-sentence; the items with every decision never reached ClaudeInputPaste the full notes (or upload the document). Tip: end long pastes with "END OF NOTES" so a cut-off is easy to spot
Nepali translation uses the informal "तिमी" form to parents"Translate this into Nepali" named no reader or level of respectInstructionName the reader and the register: "for parents, using the respectful तपाईं form throughout". A Nepali speaker checks it
Travel FAQ with invented amounts and clause numbersThe leave policy was attached instead of the travel policySetupAttach the right file; then add "answer only from the attached file, quote the clause, say if it isn't there"

A better instruction can't make Claude summarise text it never received, or quote a file it doesn't have. If you said "instruction" for the first or third case, look at the input or the setup again.


Common mistakes

  • Giving up after one weak answer, or rewording at random until something works.

  • Starting with the model. Most causes are in the input or the instruction.

  • Vague gap statements like "it's bad", which lead to vague fixes.

  • Changing several things at once, so you can't tell what worked.

  • Re-running in the same long chat instead of a fresh one.

  • "That's wrong, try again" instead of feedback with an example and what must stay.

  • Trusting a table because it looks complete. Ask for the row count.

  • Fixing the answer, not the cause, so the same mistake returns next week.

  • Putting the test set inside the Project's knowledge, where Claude can read the expected answers.

  • No change log, so nobody knows why the output changed last month.


Remember

  • Don't give up and don't reword at random: find the cause.

  • Gap → Input → Instruction → Setup → One change.

  • Name the gap in one line, including what's right and must stay.

  • Most fixes are input or instruction; check the model last.

  • Change one thing, re-run in a fresh chat, compare side by side.

  • Feedback: what's wrong, what good looks like, one example, what must not change.

  • Ask for the row count on any table made from a file.

  • Save the fix, keep five tests next to the Project, re-test every change, log it.


Previous: Module 6 · Next: Module 8 · Put it together · Back to: course README

Our own notes, written for this course. Not taken from any official lesson.

↑ ↓ navigate · ↵ select · esc close