Claude Certified Architect · प्रोफेसनल

Module 5 — Team enablement

Study notes written by Sanjay Shah. Not official Anthropic material. Facts marked "check before relying on it" may have changed.

Practice this module

On this page

Course: Claude Architect (Professional), "Design, ship and govern Claude in the enterprise". Study notes in our own words. Matching video: "The holiday test: if your AI system needs you, it isn't finished". Templates T15–T19. Claude Code facts were checked on 2026-11-25 (see the README fact table).

What you'll be able to do

  • Run the holiday test and turn each dependency on you into a named owner and a documented path.

  • Design a paved road: a reference architecture, a starter repo, a shared prompt and eval library, and guardrails that live in the repo and run automatically.

  • Write a RACI for AI operations, with exactly one accountable name per row.

  • Use a skills matrix to plan who learns what, and by when.

  • Write a 30/60/90-day enablement plan that removes the architect from the approval path.

  • Write runbooks for the top AI incidents, and set an operating rhythm with adoption metrics that mean something.

Key ideas

1. The holiday test (T15)

Ask: if I were away for two weeks with no phone, what would break or stall? The usual signs of dependency:

  • Only you can change a prompt safely.

  • Only you can read the eval results and say whether a change is OK.

  • Only you can answer "is this data allowed in a prompt?"

  • Only you know how to switch platforms or models.

  • Only you know where the kill switch is, or why it exists.

Each one is a gap. Write it as a row:

What would stallWho covers it todayGapFixOwnerBy
Prompt changesOnly the architectNo review pathPrompts in the repo, PR review by the product team, eval gatePlatform leadDay 30
Reading evalsOnly the architectNo shared understanding of the metricsEval dashboard with pass bars written on it; a one-hour trainingPlatform leadDay 30
New data source approvalOnly the architectUnwritten rulesData classification rules in writing (Module 3); security consulted; architect only for PHI/PIISecurity leadDay 60
Model upgradeOnly the architectNo procedureUpgrade runbook, lifecycle calendar (Module 4)Platform leadDay 60
Incident: bad answersOnly the architectNo runbookRunbook (below); first drillOn-call leadDay 60

The test passes when the architect is away for a real week and nothing waits for them.

2. The paved road

A paved road is the easy, safe way to build. If teams take it, they get the guardrails for free. If building off-road is harder, most teams choose the road without being forced.

The parts:

  • Reference architecture. The approved shape for common cases (draft with review, extract with checks, read-only agent), each with its decision record from Module 1.

  • Starter repo. A working skeleton already wired to the gateway, identity, audit log and eval runner. A team starts by copying it, not by reading a wiki.

  • Shared prompt and eval library. Prompts and eval sets live in version control, with owners. Teams reuse and extend them.

  • Guardrails in the repo, not the wiki. Nobody reads the AI policy page. Put the policy where the work happens, and make it run by itself.

3. Guardrails in the repo: CLAUDE.md, settings, hooks, gates

When teams build with Claude Code, the rules can live with the code:

  • CLAUDE.md holds the team's standing instructions: how this repo is laid out, which commands to run, and what is never allowed. Claude reads it at the start of a session.

  • Settings and permission rules say which tools and commands are allowed, need a prompt (ask), or are denied. At the time of checking, Claude Code had managed settings, deployed by IT or the admin console, that take precedence over user and project settings and can't be overridden by users. Use them for company-wide rules.

  • Hooks run your own scripts at fixed points. A PreToolUse hook runs before a tool call and can block it, for example blocking a command that would print a secret or touch production. At the time of checking, managed settings could also restrict hooks to managed ones only.

  • Pre-merge gates in CI run the eval set and the security checks, so a prompt change that fails the bar can't merge.

A starter CLAUDE.md (extract):

Markdown
# Team rules for this repo

## Always
- Model calls go through `platform/gateway`. Never call a provider SDK directly.
- Prompts live in `prompts/` with a version header. Any change needs `make eval` to pass.
- Data access uses the user's on-behalf-of token from `platform/identity`.

## Never
- Never put real customer, patient or employee data in tests or fixtures. Use `fixtures/synthetic/`.
- Never log raw request bodies. Use `audit.record()`, which hashes the input.
- Never add a tool that writes to an external system without a `requires_human_approval` flag.

## Ask first
- New data sources, new data classes (PII/PHI) or new external endpoints: open a request to platform-security.

An example hook setup in a project settings file. This shows the shape only. Check the current Claude Code hooks documentation for the exact schema before relying on it.

JSON
{
  "permissions": {
    "deny": ["Bash(git push:*)", "Read(./.env)", "Read(./secrets/**)"]
  },
  "hooks": {
    "PreToolUse": [
      {
        "matcher": "Bash",
        "hooks": [{ "type": "command", "command": "./scripts/hooks/block-secrets-and-prod.sh" }]
      }
    ]
  }
}

On a multi-tenant SaaS platform I build, this is how the team rules work. CLAUDE.md states the tenant-isolation and audit rules. Hooks block forbidden commands and file reads before they run. A pre-merge gate runs the tests and evals. The policy runs on every change, and nobody has to remember it.

4. Ownership: the RACI (T16)

RACI means Responsible (does the work), Accountable (one person who answers for it), Consulted (asked before), Informed (told after). The rule that matters: exactly one A per row.

ActivityPlatform leadProduct owner (each team)SecurityArchitectOn-call engineerFinance partner
Prompt changes for a team's featureCA, RICI–
Shared eval libraryA, RR (own cases)CC––
Model upgradesA, RCCCII
New data source or data classRRAC (PHI/PII only)––
Incident responseCIC (data incidents)IA, R–
Cost budgets and alertsA, RR (own budget)––IC
Quarterly access reviewsRRA–––

Check it: the architect is never "A" by the end. That is the point.

5. Skills matrix (T17)

Rate each person from 0 to 3 on the skills the system needs (0 = none, 1 = can follow a runbook, 2 = can do it alone, 3 = can teach it). Plan training where a skill has fewer than two people at level 2 or higher.

PersonPrompt and eval changesReading eval resultsModel upgradeData classificationIncident handlingCost analysis
Platform lead232222
Platform engineer A221121
Platform engineer B111112
Underwriting PO110101
CS PO120100
Fraud PO010200
Architect333332

Read it as a list of risks. "Model upgrade" has one person at level 2 apart from the architect, so it is a gap. "Incident handling" is thin outside the platform team, so drills need product owners in them.

6. Runbooks (T19)

A runbook is for the person on call at 3 a.m. who didn't build the system. Format: symptom → first checks → safe actions → escalation → evidence to keep.

Runbook: "Answers got worse after an update"

PartContent
SymptomEdit rate up, complaints up, or the weekly sampled eval drops below the bar
First checksDid the prompt version, model ID, retrieval index or tool definitions change in the last 7 days? (Check the release log and the audit events.) Is the fallback model in use because of errors?
Safe actionsRoll back to the last prompt version that passed. Pin the previous model ID if it's still available. If quality affects people, pull the kill switch to the fallback process.
EscalationProduct owner (quality), platform lead (model or platform), security (if sensitive data shows up in answers)
Evidence to keepTrace IDs of the bad answers, the change record, eval results before and after, and the time of each action

Runbook: "Cost alert fired" (outline). Check which tenant, team or feature it is. Look for agent loops or retries. Apply that tenant's cap. Notify the budget owner. Keep usage by trace ID.

Runbook: "A user reports sensitive data in an answer" (outline). Treat it as a possible data incident. Capture the trace ID. Check the retrieval permissions and the redaction step for that request. Pull the kill switch if it might be systemic. Follow the incident and privacy notification process. Keep the evidence.

7. Operating rhythm and adoption metrics

RhythmWhat happensOwner
WeeklyEval review: sampled live traffic and edit rates against the barsPlatform lead + product owners
MonthlyCost review by team and tenant; budget changesPlatform lead + finance partner
QuarterlyIncident drill run by the platform team; access review; risk register review; lifecycle calendar checkOn-call lead, security, platform lead
On every changeEval gate; change recordChange author + reviewer

Adoption metrics that matter:

  • the number of teams shipping on the paved road

  • the time a new team takes to ship its first feature

  • the share of changes merged without the architect

  • the number of incidents handled end to end without the architect

  • the target outcomes per feature (Module 4)

Raw usage counts on their own don't tell you whether teams can run the system.

Worked case — Insurance: from one architect to three teams

An insurance company's architect built the first Claude system, which summarises claims documents. Now three product teams want it, for underwriting, customer service and fraud review, and a six-person platform team will own the shared parts. Today the architect is the only person who can change prompts or approve a new data source.

30/60/90-day plan (T18, filled)

By dayOutcomes
30Starter repo and shared eval set published. The architect pairs with each product team on its first change. RACI drafted and agreed. Holiday test run once on paper, with gaps given owners. Prompts moved into the repo with a pre-merge eval gate.
60The platform team owns prompt releases and model upgrades, and the architect is only a reviewer. The first incident drill is run by the platform team. Each product team ships one feature on the paved road. Upgrade and incident runbooks are published.
90The architect is out of the approval path except for new data classes (PHI/PII). The holiday test passes with the architect away for a real week. Adoption metrics are reported monthly.

RACI highlights

  • The platform lead is accountable for upgrades and cost.

  • Each product owner is accountable for their team's prompts and evals.

  • Security is accountable for new data sources, and is consulted on data incidents.

  • The architect is consulted only.

First three runbooks

"Answers got worse after an update", "Cost alert fired", and "A user reports sensitive data in an answer" (above).

What the fraud team needed in addition

Fraud review touches decisions about people (Module 3), so the paved road adds a rule for them. Claude informs: it summarises the evidence and the links between cases. An investigator decides, and every decision records a reason. Their eval set includes checks that summaries don't add accusations the evidence doesn't support.

Trade-offs to weigh

Trade-offLean one way when…Lean the other way when…
Central platform team vs each team on its ownSeveral teams share risks, data classes and costsOne team, one use, low risk
Strict paved road vs freedom to go off-roadRegulated data, shared infrastructure, a young platformMature teams, experimental low-risk work (still with the gateway and audit log)
Guardrails as hooks and gates vs guidance documentsThe rule must hold every time (secrets, data classes, eval bar)It's a style preference where judgement is fine
Architect as reviewer vs fully hands-offNew data classes, high-risk decisions about peopleRoutine changes on the paved road
More runbooks vs better trainingIncidents are repeatable and time-criticalProblems are rare and need judgement

Common mistakes

  • The architect as the permanent bottleneck, called "governance".

  • A policy wiki instead of rules enforced in the repo and the pipeline.

  • A RACI with two A's, or with "the team" as accountable.

  • Runbooks written by the builder for the builder, which assume knowledge the on-call person lacks.

  • No drills. The first time the runbook is used is a real incident.

  • Counting usage as adoption, instead of measuring teams that can ship and run on their own.

  • Teams copying the starter repo once and drifting. Keep the shared parts as dependencies they update, not copies they forget.

  • Handing over without pairing. Documents alone rarely transfer judgement.

Remember

  • Holiday test: if it needs you, it isn't finished. Turn each dependency into an owner and a documented path.

  • Paved road: reference architecture → starter repo → shared prompts and evals → guardrails → platform services.

  • Guardrails in the repo: CLAUDE.md for the rules, settings and hooks to enforce them, pre-merge gates to check them.

  • RACI: one accountable name per row. By day 90 the architect is consulted, not accountable.

  • Runbooks: symptom, first checks, safe actions, escalation, evidence. Drill them every quarter.

  • Rhythm: weekly evals, monthly cost, quarterly drill and reviews.

  • Measure adoption as teams shipping and running it without you.

The five artefacts as one system (course close)

The capstone asks you to produce all five for one system.

Self-check (no answers; talk it through with a peer)

  1. Run the holiday test on a system you know. Which row worries you most?

  2. In your RACI, who is accountable for model upgrades? Do they know?

  3. Which of your rules lives only in a wiki? What would it take to make it a hook or a gate?

  4. When was the last drill, and who ran it?

Practice questions for this module: mcq/module-05.md.

↑ ↓ सार्नुहोस् · ↵ छान्नुहोस् · esc बन्द